Heavy Traffic Flow At Tun Dr Lim Chong Eu Expressway Due To Penang Bridge Road Closure

RM 450.00


Category

Description

GEORGE TOWN, Aug 22 – Heavy traffic flow at Tun Dr Lim Chong Eu Expressway to Penang Bridge as the Penang Bridge was closed for a year due to maintenance works on the structure linking the island to the mainland.

— Photo By Pocket News Images. Copyright © 2017 Pocket News (Manage By JSC Studio). ALL RIGHTS RESERVED.