Description
GEORGE TOWN, March 22 – PBAPP CEO Dato’ Ir. Jaseni Maidinsa today announced that Penang is ready to take back the expanded RM73.5 billion litre Mengkuang Dam from the Ministry of Energy, Green Technology and Water (KeTTHA). (PN Images/JohnShenL)
— Photo By Pocket News Images. Copyright © 2018 Pocket News (Manage By JSC Studio). ALL RIGHTS RESERVED.